The Whitewater Valley Railroad opened its new shop building in 2013, but the second track into the building, which will end over an inspection pit, remains to be installed. That work began last fall with the construction of a switch off the mainline. The shop lead will be several hundred feet long and will include a second switch leading to a currently isolated track into the “old garage”.